Vleuterweide, Utrecht, Netherlands

  • Anvendelsesområde:
  • P-huse

Peikko delivered 1250 meters of DELTABEAM® Composite Beams to construction site.

Projekt information

Leveringsår:
2009
Afleveringsår:
2010

Wim Zwaan

Managing Director, Peikko Benelux

Tel. +31(0)623807005
wim.zwaan@peikko.com