Overcoming Space and Design Constraints at Disentis Valley Station
 
A small plot and strict height limitations posed major challenges for the new parking facility. Discover how smart structural solutions turned these constraints into an efficient, user-friendly design.

 

To accommodate the growing number of visitors in the Disentis Sedrun holiday region, a larger parking garage was built at the valley station of the cable car.

The project faced significant challenges: the available plot was small, and the building could not be built higher due to the need for architectural harmony with the surrounding structures. At the same time, the parking experience had to remain spacious and comfortable.

Peikko’s innovative composite solutions met these challenges.
By combining DELTABEAM® Composite Beams, prestressed hollow-core slabs, and slender ATLANT® Composite Columns, the design achieved a highly efficient and space-saving structure. The flush installation of hollow-core slabs maximized usable floor area and reduced building height, while the slim-floor system allowed for large column spacing—up to 8.3 meters — creating flexible parking zones. The floor slabs have a thickness of 265 mm, with an additional 50 mm topping and surface coating ensuring structural integrity and optimal load distribution.
 
Fire safety was another key requirement. DELTABEAM® meets R90 fire resistance standards without additional cladding, reducing costs and simplifying maintenance. The lightweight construction also minimized foundation loads, further optimizing the design.
 
Thanks to a high degree of prefabrication and perfectly coordinated components, the parking garage with over 400 parking spaces was completed quickly and is now available to guests—blending seamlessly into the landscape while offering generous, user-friendly parking areas.
Læs mere down-arrow.png

Projekt information

Etager:
2
Projektudvikler:
Disentis Bergbahnen
Enterprenør:
Strabag AG, Disentis
Arkitekt:
ipz ingenieure + planer ag
Elementleverandør:
VS-West
Leveringsår:
2022
Afleveringsår:
2022