13 months construction time with composite structure from Peikko.

A new multipurpose commercial building was erected in Steinach for the elevator manufacturer AS Elevators.

The building complex consists of a main building with a production/warehouse hall as well as a head building with office space and a smaller commercial hall, which is intended for rental.

The complete planning was done with BIM-3D and included complex connections in the area of the crane runway due to limited room height. The connections were worked out together with Peikko.

Thanks to Peikko's DELTABEAM® Frame composite frame system, spans of up to 13 meters could be achieved and the construction time was only 13 months.

Læs mere down-arrow.png

Projekt information

Projektudvikler:
METHABAU
Enterprenør:
METHABAU
Konstruktionsingeniør:
METHABAU
Arkitekt:
METHABAU
Leveringsår:
2018
Afleveringsår:
2018

Manuel Schindler

Manuel Schindler

Technische Beratung Verbundbau

Tel. +49 7221 9929612
Mob. +49 151 1532 3778
[email protected]