Pralong RTE Electric Station, Embrun, France

  • Anvendelsesområde:
  • Energi
Fuld skærm Luk Steet view

This 225000/63000V substation is part of the renovation program of the high durability electric transmission network.

PETRA® slab hangers are being utilized so that the honeycombed tiles can be laid swiftly without having to be supported.

 

Architectual visualisations © Mrs. Agnès Canu, for RTE project management, the ITEA project manager.

A quick installation with no need for supports to create slab hangers.

Mr Mehira, Chef de chantier.

Projekt information

Projektudvikler:
RTE
Enterprenør:
STAM
Konstruktionsingeniør:
RTE
Arkitekt:
ITEA. Mme Agnès CANU
Elementleverandør:
KP1
Leveringsår:
2020

Vi leverede følgende løsninger

Sabri ALPTUNA

Sabri ALPTUNA

Directeur commercial adjoint

Mob. +33 (0) 6 47 86 91 55
[email protected]