Eikenott, Gland, Switzerland

  • Anvendelsesområde:
  • Boligbyggeri
  • P-huse
Fuld skærm Luk Steet view

Peikko provided an efficient construction method for Eikonott Gland. Speed and technically advanced details convinced the total contractor Losinger-Marazzi to use Peikko's Column Connection solution. Solution consisted of HPKM®-Column Shoes and HPM® Anchor Bolts which were used in oval shape columns. 

Peikko's Column Shoes were helpful in speeding up the whole construction process. Now building seems almost like a LEGO-game.

Bertrand Faucherre, Didier Bourqui

Projekt information

Projektstørrelse:
20 000 m2
Etager:
4
Enterprenør:
Losinger-Marazzi
Elementleverandør:
Bétontec
Leveringsår:
2012
Afleveringsår:
2014

Vi leverede følgende løsninger

Gregor SCHABRUN

Gregor SCHABRUN

Geschäftsführer

Mob. +33 (0)6 40 75 85 34
[email protected]