The fast paced project to build a Congress Center for the Cornelia Diamond Hotel in Antalya was realised successfully thanks to an efficient precast structural design.
Structure included mechanical connections of columns to foundations. The challenging six meter cantilevered beams around the perimeter of the upper floor level were connected by a combination of post-tensioning technology and Peikko bolted connections.
Cem Özer